T: (0)161 224 7227
F: (0)161 224 9284
info@fkgroup.co.uk

Download Brochure

Holloway High School

Because of our in depth knowledge and vast experience with materials, we were able to advise the client on the specification of their building envelope. As the site footprint was very tight, we called in our envelope site team to design and construct a bespoke scaffold solution, to stringent health and safety standards. Our technical department was charged with co-ordinating all building elevation set outs and levels for rain cladding, cedar cladding and architectural wall panels. We also needed to co-ordinate various trades closely, to maximise efficiency and the cost-effectiveness of the scaffold. In fact, we co-ordinated the project so tightly, we were able to hand over to the client earlier than scheduled.

Specifications

Developer
Islington Council

Location
New Malden, Surrey

Main contractor
Mclaren Construction

Specification
1,000m2 of rain soreen cladding.
1,000m2 of cedar cladding.
1,000m2 of architectural wall panels.

Sustainability Initiatives
100% of wooden pallets returned for reuse or recycled
Parts supplied in recycled, reusable plastic containers.